<img src="https://secure.office-information-24.com/785669.png" style="display:none;">
Glossary

Bill of Materials (BOM)

Full name: Bill of Materials
A Bill of Materials, or BOM, is a structured list of all the raw materials, components, subassemblies and instructions required to manufacture a finished product. A BOM typically identifies each item by part number, quantity, unit of measure and, in many systems, associated labor and overhead, providing the foundation manufacturers use for production planning, cost estimation, purchasing and inventory control. 

Quick facts

Category Structured product build definition
Used by Manufacturing, medical devices, aerospace, automotive, electronics and other production-based industries
Also called BOM
Related standards ISO 9001
Related processes Multi-level BOM, MRP, work order management, engineering change control
Semantic match bill of materials, BOM structure, BOM revision control, product build list

What is Bill of Materials (BOM)?

A Bill of Materials is the definitive list of everything needed to build a specific product, including raw materials, purchased components, subassemblies, and often the labor and process steps involved. It functions as the blueprint that connects engineering design to actual production and purchasing activity.

Each line on a BOM typically specifies a part number, description, required quantity, unit of measure, and sometimes cost or supplier information. A BOM can be structured as single-level, listing only the immediate components of a product, or multi-level, capturing the full hierarchy of subassemblies nested within the final product.

BOMs are living documents. As designs change through engineering change requests or cost optimization, the BOM must be revised and version-controlled so that production always builds to the current approved structure.

Why is Bill of Materials (BOM) important?

An accurate BOM is foundational to nearly every downstream manufacturing activity. Material requirements planning, purchasing, costing and production scheduling all depend on the BOM correctly reflecting what a product actually requires.

Errors or outdated information in a BOM can cascade into purchasing the wrong materials, miscalculating product cost, or building product incorrectly, making BOM accuracy and revision control a high-leverage area for manufacturing quality and efficiency.

BOMs also support traceability and compliance in regulated industries, since a controlled, versioned BOM provides evidence of exactly what a product was built from at any point in time.

How does Bill of Materials (BOM) work?

A typical Bill of Materials process includes:

  1. Creation. Define the components, quantities and structure needed to build the product.
  2. Structuring. Organize the BOM as single-level or multi-level depending on product complexity.
  3. Costing. Roll up material, labor and overhead costs from the BOM structure.
  4. Integration. Connect the BOM to MRP, purchasing and work order systems.
  5. Revision control. Track changes to the BOM with version history and approvals.
  6. Maintenance. Update the BOM as engineering changes, cost changes or supplier changes occur.

Single-Level BOM vs. Multi-Level BOM

Comparison Single-Level BOM Multi-Level BOM
Structure Lists only immediate components Shows full hierarchy of subassemblies
Best suited for Simple products with few components Complex products with multiple assemblies
Planning complexity Lower Higher, but more accurate for complex builds

Real-world examples of Bill of Materials (BOM)

An electronics manufacturer builds a BOM for a new device, listing every component, connector and fastener needed, then uses that BOM to drive material requirements planning and purchasing for the first production run.

A medical device company revises a BOM after an engineering change replaces one component with an approved alternate, ensuring that production, purchasing and cost calculations all reflect the new structure going forward.

An automotive supplier maintains a multi-level BOM for a complex assembly, allowing planners to see not just the final part but every subassembly and its own required materials.

Regulations and standards related to Bill of Materials (BOM)

ISO 9001 does not name Bill of Materials specifically, but its requirements for controlling production information and documented information for design and development outputs apply to how organizations manage and control their BOMs.

In regulated industries, BOM accuracy and revision history support broader traceability requirements, since a controlled BOM is often a key input to a Device Master Record, Design History File or similar compliance documentation.

Required by

How QT9 helps with Bill of Materials (BOM)

QT9 ERP/MRP Bill of Materials capabilities

  • Build and manage multi-level BOMs with real-time updates.
  • Track material, labor and overhead costs in real time with automatic cost rollups.
  • Maintain revision history and quickly update BOMs as changes occur.
  • Connect BOMs directly to routing, inventory and production plans.
  • Auto-generate work orders directly from approved BOMs.
  • Enforce consistent part usage and reduce duplicated records.

Request a BOM Demo Explore Bill of Materials Software →

See QT9 Software in Action

Discover how QT9 Software helps manufacturers improve efficiency, strengthen compliance and connect quality management and ERP processes within one integrated platform.

Common mistakes with Bill of Materials (BOM)

Common mistakes include allowing production to build from an outdated BOM revision because change control and BOM updates were not properly synchronized, and failing to keep cost data current, which distorts product costing over time.

Other problems include inconsistent part numbering or duplicate records across BOMs, which undermines accurate material planning and purchasing.

Frequently asked questions

A BOM typically includes each component's part number, description, required quantity and unit of measure, and often includes associated labor, overhead and cost information needed to build the finished product.
A single-level BOM lists only the immediate components needed for a product without showing subassembly relationships. A multi-level BOM captures the full hierarchy, including subassemblies and their own component lists nested within the final product.
Material Requirements Planning, or MRP, uses the BOM as a core input to calculate what materials are needed, in what quantities and by when, based on production schedules and existing inventory levels.
Responsibility often involves engineering for design accuracy and production or materials teams for keeping quantities, costs and supplier data current, with formal changes typically going through engineering change control.
An inaccurate BOM can lead to purchasing the wrong materials or quantities, miscalculating product costs, or building products incorrectly, since so many downstream processes rely directly on BOM data.
Yes. Many BOM systems allow labor and overhead to be included alongside materials, enabling a complete cost rollup that reflects the true cost to build a product, not just its material content.

Related quality management terms

Related content

Ready to Transform Your Business?

See how QT9 Software helps manufacturers simplify operations, improve traceability and drive continuous improvement with integrated quality management and ERP software.

Last reviewed: July 21, 2026